Pataki administration fails again at Linde/Praxair
site :
State will OK Army Corps' position not to clean up
contaminated groundwater
The Buffalo District Army Corps of Engineers has
released its CERCLA "Feasibility Study
Report for the Groundwater Operable Unit, Linde Site, Tonawanda, NY," dated
October 2004. The Corps' self-described "limited" report is the result of
a seriously deficient hydrogeologic sampling and characterization effort for
such a significant groundwater contamination event. This superficial
study does not satisfy the requirements of CERCLA, let alone
NEPA.
The Corps' has simply restated its original position
for managing Linde groundwater contamination: there will be no attempt to
recover the large quantities of total uranium (~12,000 pounds or 3.7 Curies),
radium (~5.5 Curies), thorium (unspecified), and other heavy metals, including
mercury, molybdenum, and chromium contained in an estimated 55 million gallons
of liquid wastes that were illegally pumped down seven onsite wells into the
glacial till/bedrock contact zone during Manhattan Project operations at Linde
in the 1940s (see discussion in the
Federal
Connection report starting at this PDF file's page 145 and Exhibits
3 through 8 in the Appendix to
the Federal Connection.)
Yet again, the Pataki administration has indicated that
it intends to let the federal government off the hook rather than enforce
public health laws that have mandated the remediation of radioactive wastes at
the Linde site since1980. The Pataki administration and State Attorney
General Eliot Spitzer failed miserably to enforce the law after Army Corps
issued its 2000 Linde ROD containing the illegal, nationally-criticized soil
cleanup criteria -- see "Army Improperly Selects Cleanup
Criteria," and
Washington
Post article. And in 1998 no action was taken to prevent Army Corps'
implementation of the deficient 40 pCi/g thorium guideline at the Ashland
properties. See F.A.C.T.S.' federal district court
complaint.
F.A.C.T.S.' Comments on the Study :
January 26, 2005
Mr. Ray Pilon Buffalo District U.S. Army Corps of
Engineers 1776 Niagara Street Buffalo, NY 14207-3199
Subject: Comments on Feasibility Study for the Linde
Groundwater Operable Unit
Dear Mr. Pilon:
F.A.C.T.S.' comments on the Linde groundwater feasibility
study are the following:
1) Linde deep groundwater meets the 40 CFR 192
definition of an aquifer. Exceedances of the groundwater standards have
been found. Development and execution of a remediation plan is required
under this law.
2) (a) Even the limited sampling of monitoring
wells reveals concentrations of uranium, radium, chromium, mercury, and
molybdenum that exceed the limits of the Corps' chosen
ARAR -- 40 CFR Part 192, Subpart A -- and well
above the more stringent NYS groundwater protection standards, 6 NYCRR Parts
730-733. (b) The 5.4 pCi/L radium exceedance found in new well
LMW-05 (located at a distance of ~1200 feet from the injection wells) is
particularly troubling as this well is located less than 200 feet from the
Holmes Elementary School property. This finding underscores the
likelihood that radium exceedances currently exist in groundwater beyond the
Praxair property line -- see previous comment 18 below, made 11 years ago,
warning of greater radium mobility -- and reflects the failure to develop and
execute a timely corrective action plan.
3) 40 CFR Part 192, Subparts A and D are
ARARs at the Linde site because this site was licensed prior to
UMTRCA by NYS (see F.A.C.T.S.' 3-3-97 letter to NYS DOL Commissioner
Sweeney), therefore Subpart D is an applicable ARAR.
Specifically Sections 192.02(c), 192.03, 192.04, and Sections 192.30 et
seq., clearly require the development of an active groundwater remediation
alternative at Linde. The Corps has not done this.
Only groundwaters having a natural total dissolved solids
(TDS) level above 10,000 mg/L may be exempted. TDS in the Linde
groundwater is well below this level. And an exemption for Linde
groundwater has not been sought. Yet the Corps brashly cites high TDS and
salts content of the deep groundwater as the reason for not executing a
thorough investigation and remediation. The Corps is plainly wrong
here. The Corps further rationalizes about the relatively low yield of
the shallow groundwater, and the current availability of a public water system
(another institutional longevity issue -- see comment 7 below) as factors in
its decision to limit the study and to not evaluate various proven groundwater
remediation techniques.
4) The Corps has incorrectly determined that the
federal and more stringent NY State drinking water laws intended to prevent
degradation of aquifers are not applicable. In the past, area wells have
supplied water for multiple uses, including drinking water. The NYS
standards are appropriate and relevant ARARs for remediation of this site --
see previous comment 13 below.
5) The Corps has incorrectly selected (simply for
immediate legal convenience) the fence line of the Praxair property as the
point for determining compliance with the groundwater contamination limits. The
law defines the (vertical) point of compliance as the edge of the disposal
area. In this case the edge of the disposal area should be a short radius
from each injection well; DOE has said (in the 1992 Remedial Investigation
Report) the effluent mostly precipitated in close proximity to the wells.
Years from now, as the contamination plume continues to extend off-site,
presumably the Corps will contact off-site property owners as it redefines the
point of compliance in order to satisfy 40 CFR 192.
6) The Corps plans to use some form of federal
institutional control in an attempt to limit exposure to this waste.
Rather than place actual deed restrictions on the Praxair property as a whole,
the Corps intends to acquire easements for access to 14 small plots (24' x 24')
on the Praxair property upon which groundwater monitoring stations are to be
operated. The report's proposed land use control (LUC) wording is not
clear. It seems there may not be effective, deeded control of groundwater
use on the overall site itself. There will be no control whatsoever on
adjacent properties.
7) CERCLA requires any selected remedy to be
effective for a minimum of two hundred years, and no longer than 1000
years. Most independent radwaste experts agree that for the management of
long-lived radioactive wastes it is very unwise to assume the persistence of
governments (and therefore institutional controls) for periods longer than 100
years. In fact, the NRC's LLRW (low-level radioactive waste) dump siting
regulations, 10 CFR 61, specifically forbid reliance on any form of
institutional control as a means to limit human exposure to waste for periods
greater than 100 years. Thus, the Army Corps' proposal is inconsistent
with the reasoned policy of a radioactive waste control law promulgated under a
NEPA process with broad public participation
8) No thorough evaluation was made of the chemical
environments in the injection zones; such information is essential to determine
the chemical form, solubility, and mobility potential of heavy metals, notably
uranium. The conclusions made by the Corps are simply
assumptions.
9) Sampling : The number of sampling wells is
insufficient. No wells were located to the SE of the injections wells, a
direction shown to be downgradient. No samples were collected from the
more permeable gravelly sand layer directly overlying the bedrock surface; this
layer has a higher flow velocity and likely was a significant portion of the
injection zone.
10) Background monitoring station used to set
background contaminant levels : the onsite location is too close to injection
sites. Background points should be well upgradient (see previous comment
48 below) and in this case certainly off-site (previously ORAU used a site over
a mile away), especially given the Corps' improperly selected Praxair
fence-line point of compliance. While Linde/Union Carbide/Praxair have
been cooperative participants in government malfeasance at this site from the
very beginning, Army Corps clearly wishes to avoid possible legal entanglements
with other adjacent property owners resulting from the siting of monitoring
wells on their properties.
11) 40 CFR 192 requires the timely execution of
a remediation plan and/or the commencement of a corrective no later than
18 months after a finding of exceedance of contaminant levels. The RI
performed by Bechtel in 1991 found radium water samples above the 5 pCi/L
radium standard. In previous comments F.A.C.T.S. pointed this out and
requested a corrective action be commenced (see previous comment 13 below).
12) The reported 0.52 Curies of radium is an
arbitrary estimate by Army Corps. It is not supported by evidence, and
therefore is not valid. The 5.5 Curies of radium derived from the
operating limits of the Ceramics Plant represents a more conservative, and
likely more accurate, approximation of the amount of radium injected
underground. Similarly, the actual mass of total uranium injected
according to Aerospace (1981) was ~3.7 Curies, or 12,000 pounds.
Resubmission of previous, pertinent public review process
comments:
F.A.C.T.S. comments on "Proposed
Plan for the Ashland 1 and Ashland 2 Sites, Tonawanda, New York, November 1997,
Final, USACE/OR/21950-1029", January 20, 1998
9) We think the U.S. Nuclear Regulatory Commission (NRC)
is the agency responsible for regulating the management and disposition of all
the MED/AEC 11.e.(2) byproduct materials present at the Tonawanda Site
properties. Title II of the Uranium Mill Tailings Radiation Control Act of 1978
(UMTRCA), which amends the Atomic Energy Act of 1954 (AEA), specifically
directs the U.S. Nuclear Regulatory Commission (NRC) to control the management
of any 11.e.(2) byproduct materials. This includes such materials located at
inactive uranium mill tailings sites such as the Tonawanda Site.
13) With respect to 40 CFR 192 Sec. 192.33 "Corrective
action programs," in my comments on the draft RI/FS-EIS (see comment 31,
reference 3), I said that water from well B29W09D at Linde contained radium-226
in concentrations exceeding the EPA drinking water standard of 5
picoCuries/liter [pCi/g] (draft RI pp 4-216, 4-217, 7-18) and I called for
further evaluation of groundwater impacts and the identification of potential
remediation techniques. In response, DOE maintained that, since groundwater in
the area is not currently used for drinking water, drinking water guidelines
are not applicable. However, according to NYS DEC, "(a)ll fresh groundwater in
the State is classified as GA, with an intended best usage as a source of
drinking water ... regardless of its current use." (see pp 24 and 25 of
enclosure to reference 4) Section 192.33 requires that a corrective action
program "be put into operation as soon as is practicable, and in no event later
than eighteen (18) months after a finding of exceedance." To our knowledge, no
such action has been taken. Why not?
Comments on RI/FS-EIS for the
Tonawanda, NY FUSRAP Site, 2-10-94, James M. Rauch
RI comments:
18) Pg 3-35 : Unconsolidated material: The varved
lacustrine clay is described as "very thin locally", for example, three feet
thick at bore hole B55G48 at the southern end of Seaway. The possibility of
discontinuity in this layer at Seaway cannot be discounted. Discontinuities do
occur at Ashland 1 and 2. When coupled with desiccation cracking of the clay
unit, piping of particles (approximately 1 foot/day, pg 3-46), sand lenses in
the overlying till and zones of fine-grained sands in the underlying
glaciolacustrine unit which have higher hydraulic conductivity, the route to
the contact zone aquifer may be complete. Over the long term, DOE scenarios
ruling out this pathway are not justified. In fact, DOE does not adequately
address long-term groundwater impacts either here or at the Linde injection
wells or the properties in general.
19) Pg 3-40 : Geochemical Properties of Soil: Table 3-5
lists uranium distribution ratios (Kd) determined from soil samples collected
at Ashland 1 and 2. The varved clay is characterized by only one sample. This
table has entries for which no Kd values are given. Were these samples not
analyzed? Based on this data, which ranged from 5 to 29 (cm3/g), an average
value of 10 was selected. Despite the fact that Kd values are
contaminant-specific, site-specific Kds were not determined for Ra-226 or
Th-230. A review of the distribution coefficient data (distribution coefficient
closely approximates distribution ratio) in Table 5-1 (pg 5-35) reveals
considerable variability in this important parameter. For example, Gee et al.
l980 reported a Kd for U-238 at pH 7.7 of 23,000 (cm3/g), while Rancon l973
reported a value of 100 (at pH 8), a difference of approximately two and a half
orders of magnitude. Most significantly, Gee reports a Kd of 2400 for Ra-226 at
pH 7.7, a value roughly ten times smaller than that of U-238 at pH 7.7. This
may reasonably be interpreted as an indication that the Kd of Ra-226 at
Tonawanda is approximately l cm3/g. Erroneous Kd values (too large) will
seriously underestimate radionuclide mobility. Anionic composition of the
radionuclides is not given. Table 5-4 indicates moderately high solubility for
both radium nitrate and thorium sulfate. Based on this data and data in Table
5-2, thorium mobility may be underestimated, and radium mobility is likely to
be greater than, not less than, that of uranium.
20) Pg 3-40 : Measured cation exchange capacities for the
till, varved clay, and glaciolacustrine deposits show considerable variability,
from 30 to 485 meq/100g. It is unclear whether each of the three ranges given
results from samples from all three soil units or if each range applies to one
each of the soil units; it is also stated that these results are being
verified. Please explain. Is it not realistic to expect this range of
non-uniformity across the soil types? Since this exchange capacity is an
important parameter in determining the mobility of the radionuclides,
assumptions made here may introduce a ten-fold error.
29) Pg 4-83 : Nature and Extent of Contamination in
Groundwater: At a meeting last winter at the Tonawanda office, in response to
questions concerning the fate of the effluent injected into the Linde wells and
possible remediation, Site Manager Ron Kirk said that the injected effluent was
"gone", implying there was nothing to remediate. An opposite conclusion based
on numerous assumptions is presented in section 4.3. The suggestion (pg 4-28)
that injected effluent remains confined to a limited injection zone is not
adequately supported by results from just two offset wells. Because "no
detailed chemical analysis is available for the effluents disposed of by
injection" (pg 4-89), it is impossible to accurately determine the extent of
precipitate formation. The fact that an offset bore hole #1 core showed 176
pCi/g of U-238 and 1.3 pCi/g of Ra-226 (pg 428), when compared with an
estimated 3 Ci of uranium and 5.5 Ci of Ra-226 injected, may indicate migration
of radium. The injection scenario remains obscure. It is suggested that the
effluent plume may have entered the glaciofluvial deposits and based on
combined glaciofluvial (5.5 ft/yr) and Salina bedrock (24 ft/yr) groundwater
flow velocities, it is further suggested that the area of contamination may
extend laterally for 300 to 1200 feet (pg 4-87). The glaciofluvial estimate of
flow velocity may be too low. Page 3-38 states that this unit is conservatively
assumed to be composed of "coarse-grained materials (sand)", yet the 5.5 ft/yr
estimate of groundwater velocity incorporates an estimate of hydraulic
conductivity (lower) for silty sand (pg 3-53). (Contact-zone groundwater
velocity at Seaway was estimated at 82 ft/yr.) Page 4-87 indicates that
analysis of radiological and chemical contaminants in the contact-zone is being
refined and will be included in a later technical memorandum. This is
insufficient. The information presented in the RI does not adequately define
the injected effluent or its fate, and the resulting long-term impacts. The
purposes of NEPA review are not satisfied.
30) Pg 5-22 : Perched Groundwater System: The
significance of lateral migration in the perched groundwater system may be
seriously underestimated. Despite evidence of widespread heterogeneity in the
composition of the till, water flow models are developed which emphasize the
unlikelihood of contaminant migration to deeper aquifers (see comment 18) while
tending to ignore the higher horizontal groundwater velocities (26 ft/yr, to
1049 ft/yr at Seaway) in the perched system. There are too few wells to
characterize migration in this non-uniform till, therefore risk modeling for
this exposure pathway is insufficient for the long term, especially considering
the indefinite duration of the hazard.
31) Pg 7-5 : The conclusion is drawn that uranium
concentrations in the groundwater are below the DOE DCG, ignoring the fact that
a Ra-226 concentration in well B29W09D exceeded the DOE drinking water
guideline of 5 pCi/l. This establishes the need for further analysis of
groundwater impacts as well as the evaluation and presentation of potential
remediation techniques. (See comments 29 and 50)
Baseline Risk Assessment comments:
48) Pg 2-3 : Background : The selection of Ashland 2
South for background soil levels is not representative of area-wide background
as determined by ORAU (see comment 24). This biases the risk assessment process
and results in underestimates. Selection of sampling well B29W05D at the
southern boundary of Linde (located within 1000 feet of the injection wells) as
the background location for groundwater may result in similar bias. While the
well is supposedly upgradient from Linde, groundwater flow in the area is
somewhat indeterminate. Both Wehran (1979) and Yager, Tepper, and Kappel
("Hydrogeology of the Niagara Falls Area - a Survey of the USGS Study"
presented at the International Symposium on Groundwater Issues of the Lower
Great Lakes, November 7-8, 1991) indicate that groundwater flow in the
contact-zone aquifer is in a southerly direction. Wehran suggested the
possibility that the southward flow is induced by the pumping of several large
industrial wells located to the south.
50) Pg 2-18 : Table 2-2: In view of comments 31 and 48,
Ra-226 should have been included as a groundwater contaminant of concern. It
can be shown that 39 billion cubic feet of water would be required to dilute
the estimated 5.5 Ci of Ra-226 which were injected into the Linde wells to the
level of DOE's drinking water guideline of 5 pCi/liter. [Thirty-nine billion
cubic feet translates into eight hundred ninety thousand acre-feet, a volume
roughly one-tenth the surface area of Lake Erie to a depth of one foot.] In
terms of the groundwater that has flowed past the injection wells in the last
50 years, rough calculations show that this flow is insufficient by at least a
factor of 100 to dilute the Ra-226 activity to a level below the
guideline.
52) Pg 3-15 : Identification of Exposure Pathways:
Migration of contaminants through groundwater is not considered an exposure
pathway because the affected aquifer is not considered potable. However,
current use of area wells for lawn watering, etc., and potential future uses
are ignored. Exclusion of this pathway from the risk analysis is not justified.
Sincerely,
Ralph
Krieger
James Rauch
cc: Barbara Youngberg, NYS DEC
Paul Giardina, US EPA
Eliot Spitzer |